Since Interstate Freeways are a community’s economic lifeline, any attempt to impose tolls on Oregon freeways should be with voter approval only! Oregon Transportation officials are considering placing tolls on I-5 and I-205, and tolls on I-84 may follow. Keep Oregon Freeways Toll Free is processing a voter initiative to ensure tolls on Oregon freeways are by voter approval only.

Join us in making that happen by volunteering & donating below:

Volunteer
Here
Donate
Here
INTERSTATE OREGON 5
INTERSTATE OREGON 205
INTERSTATE OREGON 84

Our Voter Initiative

Take Back Taxpayer Control Over WSDOT & ODOT & The IBR

Our Voter Initiative is an Oregon Constitutional Amendment
that restricts tolls on Interstate Freeways and Highways.

Our Voter Initiative

WSDOT, ODOT, & THE IBR ARE ABOUT TO IMPOSE A $15-$17 BILLION TOLL & TAX LEVY ON ALL OR & WA RESIDENTS, WITHOUT TAXPAYER OVERSIGHT OR VOTER APPROVAL, BASED ON A PROJECT FRAUDULENTLY MISREPRESENTED AS A SOLUTION FOR TRAFFIC CONGESTION AT THE I-5 COLUMBIA RIVER CROSSING.

Their solution: build a massive 2.5-mile bridge & light rail project for $15-$17 billion based on a fraudulent light rail estimate of 26,000 to 33,000 daily riders (the actual is only 4,600–5,400, which is easily supported by a few extra buses). Worse, their massive bridge design adds no additional traffic lanes beyond those provided today by the current interstate bridge.

 Don’t expect any relief from traffic congestion at the crossing, but do expect 20+ years of construction, costly tolls on I-5, I-205, & I-84, and a major tax increase!

6 KEY REASONS WHY VOTER CONTROL OVER WSDOT, ODOT, AND THE IBR MUST BE RE-ESTABLISHED:

1 / 6

IBR’S PROJECT’S MAIN TASK WAS TO SOLVE TRAFFIC CONGESTION AT THE I-5 CROSSING; IT WILL NOT. THAT RAISES SERIOUS CONCERNS THAT THE IBR WAS REALLY CREATED TO IMPOSE TOLLS AT THE I-5 CROSSING, DISGUISED AS A BRIDGE PROJECT

IBR’s new bridge will have the same 3 through-lanes and 1 auxiliary lane in each direction as exists today with the Interstate Bridge. Congestion will remain. Traffic experts recommend four or five through-lanes. The I-205 bridge, with four full through-lanes each way and comparable traffic volumes, already experiences daily congestion. The IBR rejected additional lanes and a third crossing that could also serve as an evacuation route after a Cascadia earthquake. Many longtime observers now view the IBR as a self-directed agency whose primary achievement will be locking in permanent revenue for WSDOT and ODOT through extreme tolls and higher taxes—while delivering a bridge that does little to solve the traffic problem it claims to address.

2 / 6

AT $15-$17 BILLION, THE IBR PROJECT HAS BECOME TOO EXPENSIVE TO CONTINUE WITHOUT REPLACING THE OWLAC WITH A NEW OVERSIGHT COMMITTEE TO PROTECT CITIZEN & TAXPAYER INTERESTS

When the IBR was created, IBR organizers established the Joint Oregon-Washington Legislative Action Committee (OWLAC). It was presented as the “watchdog” oversight body that would protect taxpayer interests. In reality, the OWLAC was structured to limit citizen participation, technical expertise, and veto authority that IBR’s predecessor watchdog committee, the CRC’s Project Sponsors Council (PSC), had over the CRC. In its 7 years, the OWLAC failed to seriously investigate the critical claims against the IBR made in testimony before it, nor has it required an independent financial audit of the IBR. The OWLAC needs to be immediately replaced with an oversight committee similar to the PSC.

3 / 6

A LACK OF TAXPAYER OVERSIGHT FUELS CLAIMS OF IBR PROJECT MISDIRECTION, AND FISCAL MISMANAGEMENT

For 7 years, the IBR has been operating without sufficient taxpayer & citizen oversight. In that time, IBR’s first administrator awarded his former employer (WSP) a $44 million cost-plus renewable engineering consulting contract without competitive bidding, guaranteeing WSP a 32 percent net profit, with 11 contract renewals as of mid-2026. For years, the project justified a light-rail extension—and therefore a 2.5-mile bridge with four stations—on WSP’s claim of 26,000–33,000 daily riders to support the project’s Locally Preferred Alternative (LPA). In 2025, the Federal Highway Administration (FHWA) forced the IBR to correct ridership to 4,600–5,400, a volume that bus service could handle, which effectively made the project’s LPA null & void. Without critical oversight, the IBR continues to withhold design information from residents and reject safety reviews of its bridge design, make false claims about the seismic condition of the historic Interstate Bridge, and hide actual project costs from the public. The IBR now intends to award its main construction contract to the Kiewit group with no competitive bidders. The IBR cannot be allowed to continue operating without first establishing a taxpayer & citizen oversight committee with veto power.

4 / 6

WSDOT, ODOT, & the IBR HAVE TROUBLED HISTORIES OF COST OVERRUNS AND FAILURES TO COMPLETE PROJECTS ON TIME AND WITHIN BUDGET

IBR’s predecessor, the Columbia River Crossings (CRC) project (under WSDOT & ODOT control) alone spent roughly $200 million before collapsing in 2013 under criticism of its design and lack of funding. To date, the IBR (under WSDOT & ODOT control) has spent over $270 million without any construction work, for essentially the same project as the CRC. WSDOT and ODOT have long records of delays and cost overruns. A recent example is ODOT’s Abernethy Bridge project: begun in 2022 with a $250 million estimate and a 2025 completion target, it is now projected at $885 million and completion in 2028. Given WSDOT, ODOT, and IBR’s track record of mismanaging large projects, the IBR project could take 20-30 years to complete at a cost of $ 30+ billion.

5 / 6

TOLLS ON MAJOR INTERSTATE FREEWAYS SIGNIFICANTLY RAISE THE COST OF LIVING FOR RESIDENTS IN BOTH STATES, AND UNFAIRLY IMPACT LOCAL RESIDENTS AND BUSINESSES USING THE BRIDGE.

Assuming two crossings per day, daily users and commuters using IBR’s bridge could face roughly $2,350 a year in tolls, while freight operators would pay far more. Hayden Island’s large manufactured-home community—home to many retirees on fixed incomes—will be hit especially hard. A project of this scale creates debt that will raise taxes statewide in OR & WA, further increasing the cost of living in two already expensive states.

6 / 6

THE QUALITY OF LIFE IN THE PACIFIC NW IS ENHANCED BY ITS UNIQUE HISTORIC PLACES & BRIDGES. THE EXISTING INTERSTATE BRIDGE HAS ANOTHER 70–100 YEARS OF SERVICE LIFE REMAINING, AND MUST BE PRESERVED FOR FUTURE GENERATIONS.

The existing Interstate Bridge is listed on the National Register of Historic Places, and is the youngest of 262 older Oregon and Washington spans. Engineering estimates give it 70-100 years more of active service life. A 2006 CRC seismic study concluded the bridge could be retrofitted to earthquake standards for $125–265 million, far less than the roughly $390 million budgeted simply to demolish it. The IBR could easily opt for a shorter, more cost-effective bridge or Immersed Tube Tunnel (ITT), and build it parallel to the existing Interstate Bridge. In doing so, the Interstate Bridge could be repurposed as an alternative vehicle, bicycle, and walkway attraction for Vancouver & Portland.

Keep Oregon Freeways Toll Free Is a Hayden Island Community Safety Initiative, Citizen Alliance

Keep Oregon Freeways Toll Free

An Oregon Statewide Citizen Alliance Initiative

Our address is:
Keep Oregon Freeways Toll Free
PO Box 17357, Portland, OR 97217
Email: garyc@keeporegonfreeways-tollfree.com

© 2026 KeepOregonFreeways-TollFree.com All Rights Reserved.
IBR Misled Us: The IBR And Its' Engineering Consultant (WSP) Generated A False Lightrail Ridership Estimate of 26,000–33,000 Daily Riders In Order To Justify A 2.5 Mile Long Massive Bridge, When Forced To Admit Last Year The True Estimate Was Only 4,600–5,400 Riders Per Day ...Easily Handled With Extra Bus Service. A Much Shorter Bridge Or An Immersed Tube Tunnel (ITT) Will Save Taxpayers $ Billions!★